The Overview and Scrutiny (Performance and Growth) Panel is invited to comment on the report for Cabinet and Council.
Executive Councillor- Tom Sanderson
Minutes:
By means of a report by Head of Planning, Infrastructure and Public Protection (a copy of which was appended in the Minute Book), the Pre-Submission Local Plan to 2046 Sustainability Appraisal and Supporting Documents was presented to the Panel.
The Chair queried why a Member’s position on the Local Plan appeared to have changed compared to the adopted Local Plan, noting that they had previously voted against it. The Panel heard that the Member considered their opposition to the previous Local Plan to have been a mistake and urged Members not to make the same error. The importance of having development guided by a robust, infrastructure-led Local Plan rather than being driven by developers was emphasised. Reference was also made to the significant amount of work undertaken over the previous three and a half years to prepare the Plan.
In response to a question, the Panel was advised that the term home in the report referred to an individual unit of accommodation of any form capable of being occupied by a single person, a family or other household. It was also confirmed that infrastructure planning was based on projected population growth arising from the number of new homes expected to be delivered across the district.
Clarification was sought on the number of homes referenced, noting that the figure stated at the meeting differed from that contained within the Local Plan. A request was also made for the proposal relating to Upwood to be referred to as Upwood rather than Ramsey in future references. The Panel was advised that the Local Plan provides for 32,200 homes between 2021 and 2046, of which approximately 4,200 had already been completed and 11,300 had existing planning permission. Regarding the naming of the proposal, Members were informed that, for consistency with the evidence base, it would preferably remain listed under Ramsey for the current consultation stage, with the potential for amendment at a later stage. The proposed approach was accepted.
In response to a question regarding infrastructure in rural areas, the Panel’s attention was drawn to the Infrastructure Readiness Report set out in Appendix 7 to the report. It was confirmed that extensive consultation had been undertaken with infrastructure providers, enabling them to plan when infrastructure would be required and delivered. The Local Plan would provide certainty to support the phasing of development. A stepped trajectory had been included to allow infrastructure to be delivered alongside development throughout the Plan period.
Clarification was sought on whether development would take place only once infrastructure was in place. The Panel was advised that, in the absence of a Local Plan, planning applications could still be submitted by developers. However, an adopted Local Plan provides a clear vision for growth and a delivery trajectory, enabling Officers to work proactively with developers and infrastructure providers to ensure that necessary infrastructure is planned and delivered alongside development.
Concern was raised regarding the fallback position should the A141 scheme not be delivered, given its importance to infrastructure planning in North Huntingdonshire. The Panel heard that the Plan covers a 25-year period and that national planning guidance requires plans to remain flexible in response to changing economic circumstances. Members were informed that the Council had been working with the Cambridgeshire and Peterborough Combined Authority since 2018 to progress the A141 scheme and that the growth potential of North Huntingdonshire had been recognised within regional plans. The A141 remained a priority project and was expected to be delivered. However, it was acknowledged that circumstances could change and that the Council would review its position if required. Deliverability would form a key component of the Local Plan examination process, and the Council would continue to adapt its plans and work in partnership to support delivery. Members were also advised that implementation of the Plan would be continuously monitored.
Questions were raised regarding infrastructure capacity, particularly wastewater provision. It was noted that constraints in water supply and treatment infrastructure could affect the type of economic development supported in the district, with some employment sectors having significant water requirements.
The Panel was advised that it was not unusual for the full funding package for infrastructure projects to be unavailable at the outset of the plan-making process. Officers acknowledged existing infrastructure challenges and emphasised the importance of a plan-led approach to growth to enable the Council to work with developers, government, service providers and transport authorities to secure infrastructure alongside development. Without a Local Plan, development would be considered on an individual application basis, making it more difficult to secure strategic infrastructure. Members also heard that the Local Plan supported a range of employment opportunities and that water supply pressures were being addressed through planned investment, including new pipelines and water storage infrastructure expected during the 2030s.
It was observed that some residents had expressed the view that it may be preferable not to proceed with a Local Plan if there was a risk that it would not be found sound by the Planning Inspector.
The Panel was advised that independent examination is an important part of the Local Plan process, with Planning Inspectors commonly recommending modifications. Members were informed that the process is conducted transparently and in public. The Panel was also reminded that councils are expected to maintain an up-to-date Local Plan and that, without one, it becomes more difficult to resist inappropriate development proposals.
From a rural perspective, clarification was sought on the evidence supporting assumptions of a significant shift away from private car use, given the limited availability of alternative transport options in many rural communities.
The Panel was advised that Officers had worked with Cambridgeshire County Council on the Strategic Transport Study, which used the Combined Authority’s latest CaPCAM transport model. Members heard that the model reflects Huntingdonshire’s predominantly rural character by dividing the district into more than 200 areas and assessing factors such as growth potential and access to public transport. It was explained that major developments would be expected to incorporate significant active travel and sustainable transport infrastructure. However, in many rural villages private cars would remain the principal mode of transport.
Clarification was sought on whether developers would be expected to provide transport links to employment sites for workers.
The Panel was advised that it was not uncommon for developers to subsidise public transport services during the early phases of development, particularly where passenger numbers were not yet sufficient to support a viable service. Such arrangements would depend on the nature of the development, the type of transport provided and operational considerations.
Issues were raised on behalf of residents of Ellington regarding the impact of development at Brampton Cross on the A14, particularly the diversion of HGV traffic through the village and the resulting damage. A request was made that developers should fund any necessary improvements to the A14 and A1 junctions arising from future proposals.
The Panel was reminded that the purpose of the agenda item was to consider the Local Plan and that Brampton Cross is not proposed as an allocation. However, the strength of local feeling regarding the site was acknowledged, and Members were advised that any future planning application would include opportunities for stakeholder engagement.
A question was raised concerning the consequences of failing to meet the 31 December deadline, including whether a risk assessment had been undertaken and the impact any delay would have on the Local Plan timetable.
The Panel was advised that failing to meet the 31 December deadline would have significant implications, as it would be difficult to carry the Local Plan forward under the new legislative arrangements. Members heard that there would be fewer consultation opportunities and that much of the work undertaken to date could not simply be transferred. Missing the deadline would require the Council to issue a notice of intent and restart the Local Plan process, resulting in an estimated delay of around 30 months. Officers also confirmed that a risk review would be considered.
The issue of Local Government Reorganisation (LGR) was raised, with a query as to whether wider implications had been considered despite advice that it should not delay progress on the Local Plan.
The Panel heard that the Council would be in a stronger position with an up-to-date Local Plan in place, particularly one focused on delivering infrastructure across the district. Reference was made to other authorities that had already undergone local government reorganisation. Members were informed that Shadow Authorities could not formally commence the Local Plan process and were directed to Section 10 of the report, which outlined the implications of local government reorganisation for the Plan.
Concerns were raised regarding the financial implications of delaying the Local Plan and whether associated costs would need to be justified to both Members and the public. The Panel was advised that Officers had a clear understanding of expenditure incurred to date and anticipated future costs. It was confirmed that approximately £780,000 had been spent on preparing the Local Plan so far.
It was confirmed that further costs were likely to arise during the examination process. Members were assured that a prudent approach had been taken throughout, including undertaking joint evidence studies with internal colleagues where possible.
The importance of infrastructure planning was emphasised, while recognising the significant dependencies and uncertainties involved in delivery. It was noted that much of the required social infrastructure would be secured through Section 106 Agreements, with reference made to an example where healthcare provision had not yet been fully delivered. Clarification was also sought regarding proposed healthcare expansion at Loves Farm and whether a risk assessment should form part of the Local Plan process.
The Panel was informed that the development included a district centre with provision for a healthcare facility. Officers advised that work had been undertaken with NHS England and the developer to determine the appropriate timing for bringing the facility into operation. It was noted that a sufficient population threshold was required to make a health centre viable and that challenges had arisen in securing infrastructure delivery through Section 106 Agreements.
The Chair noted that the provision of primary healthcare infrastructure was estimated to require between £19 million and £25 million. While acknowledging that interim facilities could be funded through Section 106 Agreements, clarification was sought on how the remaining funding for permanent healthcare provision would be secured.
The Panel was advised that developments are expected to mitigate the impacts arising from their own schemes. As such, a proportion of funding is sought through Section 106 Agreements, which typically provide capital contributions rather than revenue funding. Additional funding requirements would be pursued in partnership with the Integrated Care Board and the NHS through other funding mechanisms.
In response to a question, the Panel was advised that the delivery of water recycling centres would be phased in line with future investment periods and associated infrastructure delivery programmes. Members heard that funding intentions were set out within the Statement of Common Ground with Anglian Water. It was also confirmed that other sites were available within the Council’s five-year housing land supply.
It was advised that an easy-to-read version of the Local Plan had been requested to assist councillors in understanding the document and to improve transparency and accessibility for residents wishing to engage with the Plan.
In response to a question regarding affordable military housing, the Panel was advised that the definition of affordable housing has evolved over time and now includes provisions relating to military housing. Members were informed that the Local Plan supports this policy approach. It was further explained that the policy is specifically worded to ensure that any such provision is supported by evidence of need demonstrated by the Ministry of Defence.
Clarification was sought on the evidence supporting the proposed level of growth in Little Paxton, noting that the proposal had increased from 220 homes to 410 homes. Concern was expressed that residents had previously been consulted on much smaller-scale developments and questions were raised regarding the basis for the scale of growth proposed.
The Panel was advised that the evidence supporting the proposed growth had been informed by additional work undertaken since earlier stages of the Local Plan process. This included the Stage 2 Water Cycle Study, the Infrastructure Delivery Study (Stage 2), and updated Strategic Transport Assessments, which had been used to assess the site’s suitability and infrastructure requirements.
The Chair raised a query regarding sustainable drainage systems and whether their status remained non-statutory.
The Panel heard that their inclusion within the policy would lend greater weight in decision-making.
Clarification was sought on the weighting that would be given to the sustainability and environmental elements of the Local Plan. Concern was expressed that some objectives appeared highly ambitious and that reliance on biodiversity net gain could be difficult to quantify and measure in practice.
The Panel was advised that an Inspector would not assign weight to the Plan but would test the Plan and its policies against the supporting evidence provided.
Councillors D McIlwain and H Tobias left the meeting at 20:42
Following the discussion, it was
RESOLVED
that the comments of the Overview and Scrutiny Panel be passed to Cabinet for their consideration when making a decision upon the recommendations within the report.